Unsolved
1 Rookie
•
2 Posts
0
261
August 26th, 2024 07:28
VNX Unisphere Error code 0x7211, 0x740a, 0x7409, 0x7404, 0x724b, 0x7211
Hi. I checked available our old storage VNX5100, VNX5400,
but connected unisphere error code many occured,
I don't know how about resolve errors..
This storage alert history are below.
0x724b(The following hosts have initiators that no longer have an active connection to the storage system)
0x7404(SPS is faulted)
0x724a(There are hosts whose initiators may not be connected to a storage group properly)
0x7211(Server ~~~ has some HBAs that are active but not registered ~)
0x740a(DAE 1/1 is faulted)
0x7409(DPE 0/0 is faulted)
I excepted disk faulted alert.
I wonder if the alarm "SPS is failed" caused all the rest to happen.
If I replace DPE, DAE, and SPS, Disks will they all be cleared?
please advise me.



DELL-Sam L
Moderator
•
7.7K Posts
0
August 26th, 2024 16:44
Hello Ryusl,
Based on the errors that you are getting, it looks like your VNX systems were not decommissioned correctly. Fixing the SPS issue will not resolve the rest of the issue. You will need to fix SPS issue first. Then you will need to make sure that all enclosures are connected correctly to the correct VNX system.
Once your system is able to boot then you will need to go in and remove any registered hosts and storage groups that are no longer in use. When that is completed you should be able to register any new host to your system and assign it to storage.
Ryusl
1 Rookie
•
2 Posts
0
August 27th, 2024 00:55
@DELL-Sam L Thank you for your advise, Could you please check below activities?
first action, SPS replacement(other faulted HW replacement) > all enclosures connection validate to VNX > VNX system reboot > renew hosts > alert clear check
DELL-Sam L
Moderator
•
7.7K Posts
0
August 27th, 2024 15:39
Hello Ryusl,
I would make sure that your VNX is cabled correctly first. Once that is done, then power on the system to see what faults you have. If hardware needs to be replaced, then replace hardware as needed. Once hardware has been replaced and all faults are resolved, then you will want to remove old host that are not need and add new host.