I don't have the procedure as i will be done by local DellEMC team. We will upgrade DD9500 to the same code level as DD9900. DD9500 will be shutdown, removed from rack and replaced with DD9900 head. At this point head-swap process is initiated and then we wait. How long? Depends on the size of your current configuration.
dynamox
9 Legend
•
20.4K Posts
0
August 21st, 2020 21:00
I don't have the procedure as i will be done by local DellEMC team. We will upgrade DD9500 to the same code level as DD9900. DD9500 will be shutdown, removed from rack and replaced with DD9900 head. At this point head-swap process is initiated and then we wait. How long? Depends on the size of your current configuration.
Shastr1
3 Posts
0
August 21st, 2020 07:00
Hi Dynamox,
Thank you for the confirmation. Please share if there is any document that explains the pre-requisites and steps.Thanks!
dynamox
9 Legend
•
20.4K Posts
0
August 21st, 2020 07:00
yes, we will be doing just that in a month. Head-swap DD9500 with DD9900 and keeping existing shelves.
Shastr1
3 Posts
0
August 23rd, 2020 20:00
Thank you for the confirmation