RMSE 3.1.x migration to RM 5.
We need to upgrade our RMSE environment due to it becoming eol.
I have 1 mount host (win2003 stan) and a two node exchange 2003 cluster. I run all the RMSE jobs from the mount host.
I have read the RM 5.0 migration section. Are there any specific steps or other information that may be missing from this section?
After the 5.0 upgrade, should I continue to 5.1x to resolve any known issues with 5.0x?
Thanks in advance.
I have 1 mount host (win2003 stan) and a two node exchange 2003 cluster. I run all the RMSE jobs from the mount host.
I have read the RM 5.0 migration section. Are there any specific steps or other information that may be missing from this section?
After the 5.0 upgrade, should I continue to 5.1x to resolve any known issues with 5.0x?
Thanks in advance.
0 events found
No Events found!


JamesBEMC
257 Posts
0
April 8th, 2008 03:00
I would recommend that you read up on the support statements and the latest eLab support matrix for RM 5.1, as you will need to upgrade components (Ms hotfixes, SE, Powerpath - etc - prehaps) to ensure you are supported for RM 5.1.
If it is a small configuration as you describe, you could always, just deinstall RMSE and go for a clean installation with RM 51. No need to do it, but its a handy way to get used to installing RM 5.1 from scratch and configuring appsets, jobs, etc.