Prerequisites
Follow the safety guidelines listed in Safety Instructions.
Follow the procedure listed in Before working inside your system:
Power off the sled.
Remove the sled from the enclosure.
Remove the sled cover.
Remove the air shroud.
Remove the M.2 direct riser
Remove the side cover
Remove the Riser1 4x signal cables from connectors on the system board
Remove the sideband cables between the 1U and 2U PDBs.
Removing the 2U top sled from the 2U node:
Using Phillips 1 screwdriver, remove the side screws and loosen the front captive screw that secure the 2U top sled from the 2U node.
Using both hands, slide forward and lift the 2U top sled from the 2U node.
Installing the 2U top sled on the 2U node:
Align the 2U top sled horizontally and place it on top of the 2U node.
CAUTION: Support the 2U top sled with both hands while placing it on the 2U node.
Using Phillips 1 screwdriver, tighten the side screws and front captive screw that secure the 2U top sled on the 2U node.
Connect the sideband cables between the 1U and 2U PDBs
Connect the Riser1 4x signal cables to connectors on the system board
Install the side cover.
Install the M.2 direct riser
Install the air shroud.
Install the sled cover.
Follow the procedure listed in After working inside your system:
Reconnect the peripherals and connect the system to the electrical outlet, and then power on the system.