Carrier Grade Updates for Dell PowerEdge XR11 and XR12

PDF

Important Information

NOTE:This information is relevant to the Dell PowerEdge XR11 and XR12 servers.
WARNING:The intra-building port(s) (list the port or ports) of the equipment or subassembly is suitable for connection to intra-building or unexposed wiring or cabling only. The intra-building port(s) of the equipment or subassembly MUST NOT be metallically connected to interfaces that connect to the OSP or its wiring for more than 6 meters (approximately 20 feet). These interfaces are designed for use as intra-building interfaces only (Type 2, 4, or 4a ports as described in GR-1089) and require isolation from the exposed OSP cabling. The addition of Primary Protectors is not sufficient protection to connect these interfaces metallically to an OSP wiring system.
WARNING:The intra-building port(s) (list the port or ports) of the equipment or subassembly must use shielded intra-building cabling/wiring that is grounded at both ends.
  • Bonding Network - Equipment is suitable for Common bonding Networks (CBNs).
  • Suitable installation location - Equipment is suitable for installation in Network Telecommunications Facilities (NTF) and locations where the National Electrical Code (NEC) is applicable.
  • DC bonding - Equipment is suitable for DC common (DC-C) bonding installations.
  • Approximate System Boot Time - 4 minutes, 45 second.

Rate this content

Accurate
Useful
Easy to understand
Was this article helpful?
0/3000 characters
  Please provide ratings (1-5 stars).
  Please provide ratings (1-5 stars).
  Please provide ratings (1-5 stars).
  Please select whether the article was helpful or not.
  Comments cannot contain these special characters: <>()\