Skip to main content
  • Place orders quickly and easily
  • View orders and track your shipping status
  • Create and access a list of your products
  • Manage your Dell EMC sites, products, and product-level contacts using Company Administration.

Dell PowerEdge FN I/O Module Configuration Guide 9.10(0.0)

PDF

Installing and Configuring the Switch

After you unpack the FN IOM, refer to the flow chart in the following figure for an overview of the steps you must follow to install the blade and perform the initial configuration.

Figure 1. Installing and Configuring Flowchart for FC Flex IO Modules

Installing and Configuring Flowchart for FC Flex IO Modules

To see if a switch is running the latest Dell Networking OS version, use the show version command. To download a Dell Networking OS version, go to http://support.dell.com.

Installation

Site Preparation

Before installing the switch or switches, make sure that the chosen installation location meets the following site requirements:

  • Clearance — There is adequate front and rear clearance for operator access. Allow clearance for cabling, power connections, and ventilation.

  • Cabling — The cabling is routed to avoid sources of electrical noise such as radio transmitters, broadcast amplifiers, power lines, and fluorescent lighting fixtures.

  • Ambient Temperature — The ambient switch operating temperature range is 10° to 35ºC (50° to 95ºF).

  1. Decrease the maximum temperature by 1°C (1.8°F) per 300 m (985 ft.) above 900 m (2955 ft.).

  2. Relative Humidity — The operating relative humidity is 8 percent to 85 percent (non‑condensing) with a maximum humidity gradation of 10 percent per hour.

Unpacking the Switch

Package Contents

When unpacking each switch, make sure that the following items are included:

  • One Dell Networking FN IOM module

  • One USB type A-to-DB-9 female cable

  • Getting Started Guide

  • Safety and Regulatory Information

  • Warranty and Support Information

  • Software License Agreement

Unpacking Steps

  1. Before unpacking the switch, inspect the container and immediately report any evidence of damage.

  2. Place the container on a clean, flat surface and cut all straps securing the container.

  3. Open the container or remove the container top.

  4. Carefully remove the switch from the container and place it on a secure and clean surface.

  5. Remove all packing material.

  6. Inspect the product and accessories for damage.

After you insert a Flex IO module into an empty slot, you must reload the FN IOM for the module. If you remove an installed module and insert a different module type, an error message displays to remind you that the slot is configured for a different type of Flex IO module. You must reload the switch to make the Flex IO module operational.


Rate this content

Accurate
Useful
Easy to understand
Was this article helpful?
0/3000 characters
  Please provide ratings (1-5 stars).
  Please provide ratings (1-5 stars).
  Please provide ratings (1-5 stars).
  Please select whether the article was helpful or not.
  Comments cannot contain these special characters: <>()\