PowerProtect Data Manager 19.10 Cyber Recovery User Guide

PDF

Monitoring jobs

When you run a policy or recovery operation, the Cyber Recovery software creates a job.

The Jobs content pane shows the job status, which indicates the job's progress. It lists jobs that are running, successfully completed, canceling, or canceled. When a job is completed, its status is either Success, Warning, or Critical. If a job's status is Critical, a critical alert is also associated with the job.

When you create or edit a policy, optionally in the Replication Window field, set a job window timeout value (in hours) for how long a job for a Sync action runs. If the duration of the job reaches the timeout limit, the Cyber Recovery software issues a warning alert. If you select the Enforce Replication Window checkbox and the Sync operation exceeds the timeout limit, the Cyber Recovery software completes the current DD snapshot replication and does not continue with the Sync operation.

In the Jobs content pane:

  • For more information about a job, click in a job's row to bring up the Details window.
  • To stop a running Sync, Sync Copy, Secure Copy, PowerProtect Data Manager Recovery, or Analyze job, select the job and click Cancel Job.
    • The Cyber Recovery software generates an alert for the cancel request.
  • To refresh the content pane, click the refresh icon.
  • To select how often the content pane refreshes, click the refresh icon and select the time from the list box.

The Security Officer (crso) can set up a daily Cyber Recovery job activity report. User-defined values determine when the report is generated. For more information, see Configuring a daily activity report.


Rate this content

Accurate
Useful
Easy to understand
Was this article helpful?
0/3000 characters
  Please provide ratings (1-5 stars).
  Please provide ratings (1-5 stars).
  Please provide ratings (1-5 stars).
  Please select whether the article was helpful or not.
  Comments cannot contain these special characters: <>()\