Skip to main content
  • Place orders quickly and easily
  • View orders and track your shipping status
  • Enjoy members-only rewards and discounts
  • Create and access a list of your products
  • Manage your Dell EMC sites, products, and product-level contacts using Company Administration.

Dell PowerSwitch S3048-ON Installation Guide February 2024

PDF

Switch power-up

Supply power to the S3048–ON after it is mounted in a rack or cabinet.

Dell EMC recommends reinspecting your switch before powering up. Verify the following:
  • The equipment is properly secured to the rack and properly grounded, optional.
  • The equipment rack is properly mounted and grounded, optional.
  • The ambient temperature around the unit, which may be higher than the room temperature, is within the limits specified for the S3048–ON. For more information, see Specifications.
  • There is sufficient airflow around the unit.
  • The input circuits are correctly sized for the loads and that you use sufficient overcurrent protection devices.
  • All protective covers are in place.
  • Blank panels are installed if you do not install optional modules.
NOTE:A US AC power cable is included for powering up an AC power supply. You must order all other power cables separately.
NOTE:ESD damage can occur if components are mishandled. Always wear an ESD-preventive wrist or heel ground strap when handling the S3048–ON switch and its components.

Power up sequence

When the switch powers up, the fans immediately come on at high speed. The fan speed slows as the switch continues to boot up.


Rate this content

Accurate
Useful
Easy to understand
Was this article helpful?
0/3000 characters
  Please provide ratings (1-5 stars).
  Please provide ratings (1-5 stars).
  Please provide ratings (1-5 stars).
  Please select whether the article was helpful or not.
  Comments cannot contain these special characters: <>()\