Four-post threaded configuration

  • CAUTION: To be NEBS Earthquake Z4-compliant, you must remove the tool-less latch castings described in Step 1.
  1. For this configuration, remove the latch castings from each end of the ReadyRails assemblies. To remove the two screws from each flange ear and remove each casting, use a Torx driver, item 1. Retain the castings for future rack requirements.
    Figure 1. Four-post threaded configurationIllustration of a four-post threaded configuration.
  2. For each rail, attach the front and rear flanges to the post flanges with two user-supplied screws at each end, item 2.