S4048-ON Installation Guide January 2019

PDF

Two-post center-mount configuration

  • CAUTION: Your switch is not NEBS Earthquake Z4-compliant if you use this installation method.
  1. Slide the plunger bracket rearward until it clicks into place and secure the bracket to the front post flange with two user-supplied screws, item 1.
    Figure 1. Two-post center-mount configurationIllustration of a two-post center-mount configuration.
  2. Slide the back bracket towards the post and secure it to the post flange with two user-supplied screws, item 2. 
  3. Repeat this procedure for the second rail.

Rate this content

Accurate
Useful
Easy to understand
Was this article helpful?
0/3000 characters
  Please provide ratings (1-5 stars).
  Please provide ratings (1-5 stars).
  Please provide ratings (1-5 stars).
  Please select whether the article was helpful or not.
  Comments cannot contain these special characters: <>()\