S4048-ON Installation Guide January 2019

PDF

Two-post flush-mount configuration

  • CAUTION: Your switch is not NEBS Earthquake Z4-compliant if you use this installation method.
  1. For this configuration, remove the latch castings from the front side of each ReadyRails assembly, item 1. To remove the two screws from each front flange ear on the switch side of the rail and remove each casting, use a Torx screwdriver. Retain the castings for future rack requirements. It is not necessary to remove the rear flange castings.
    Figure 1. Two-post flush-mount configuration Illustration of a two-post flush-mount configuration.
  2. Attach one rail to the front post flange with two user-supplied screws, item 2.
  3. Slide the plunger bracket forward against the vertical post and secure the plunger bracket to the post flange with two user-supplied screws. Refer to item 3.
  4. Repeat this procedure for the second rail.

Rate this content

Accurate
Useful
Easy to understand
Was this article helpful?
0/3000 characters
  Please provide ratings (1-5 stars).
  Please provide ratings (1-5 stars).
  Please provide ratings (1-5 stars).
  Please select whether the article was helpful or not.
  Comments cannot contain these special characters: <>()\