Erasing PCIe SSD Device Data Using Web Interface

To erase the data on the PCIe SSD device:
  1. In the iDRAC Web interface, go to Overview > Storage > Physical Disks > Setup.
    The Setup Physical Disk page is displayed.
  2. From the Controller drop-down menu, select the controller to view the associated PCIe SSDs.
  3. From the drop-down menus, select Secure Erase for one or more PCIe SSDs.
    If you have selected Secure Erase and you want to view the other options in the drop-down menu, then select Action and then click the drop-down menu to view the other options.
  4. From the Apply Operation Mode drop-down menu, select one of the following options:
    • At Next Reboot — Select this option to apply the actions during the next system reboot. This is the default option for PERC 8 controllers.
    • At Scheduled Time — Select this option to apply the actions at a scheduled day and time:
      • Start Time and End Time — Click the calendar icons and select the days. From the drop-down menus, select the time. The action is applied between the start time and end time.
      • From the drop-down menu, select the type of reboot:
        • No Reboot (Manually Reboot System)

        • Graceful Shutdown

        • Force Shutdown

        • Power Cycle System (cold boot)

        NOTE For PERC 8 or earlier controllers, Graceful Shutdown is the default option. For PERC 9 controllers, No Reboot (Manually Reboot System) is the default option.
  5. Click Apply.
    If the job is not created, a message indicating that the job creation was not successful is displayed. Also, the message ID and the recommended response action is displayed.

    If the job is created successfully, a message indicating that the job ID is created for the selected controller is displayed. Click Job Queue to view the progress of the job in the Job Queue page.

    If pending operation is not created, an error message is displayed. If pending operation is successful and job creation is not successful, then an error message is displayed.


Rate this content

Accurate
Useful
Easy to understand
Was this article helpful?
0/3000 characters
  Please provide ratings (1-5 stars).
  Please provide ratings (1-5 stars).
  Please provide ratings (1-5 stars).
  Please select whether the article was helpful or not.
  Comments cannot contain these special characters: <>()\