Switch power-up

Supply power to the S4100–ON Series (S4128F-ON, S4148F-ON, and S4148FE-ON) switch after you mount it in a rack or cabinet.

Dell EMC recommends reinspecting your switch before powering up. Verify the following:
  • The equipment is properly secured to the rack. Dell EMC recommends properly grounding the switch.
  • The ambient temperature around the unit, which may be higher than the room temperature, is within the limits specified for the S4100–ON Series, see Specifications.
  • There is sufficient airflow around the unit.
  • The input circuits are correctly sized for the loads and that you use sufficient overcurrent protection devices.
  • All protective covers are in place.
  • Blank panels are installed if you do not install optional modules.
  • CAUTION: Do not power up the switch if you did not install a fan module.
  • NOTE: A US AC power cable is included for powering up an AC power supply. You must order all other power cables separately.
  • NOTE: ESD damage can occur if components are mishandled. Always wear an ESD-preventive wrist or heel ground strap when handling the S4100–ON Series switch and its components.

Power up sequence

When the switch powers up, the fans immediately come on at high speed. The fan speed slows as the switch continues to boot up.


Rate this content

Accurate
Useful
Easy to understand
Was this article helpful?
0/3000 characters
  Please provide ratings (1-5 stars).
  Please provide ratings (1-5 stars).
  Please provide ratings (1-5 stars).
  Please select whether the article was helpful or not.
  Comments cannot contain these special characters: <>()\