Dell PowerStore Installation and Service Guide for PowerStore 1000, 1200, 3000, 3200, 5000, 5200, 7000, 9000, and 9200

Verify shipping package contents

Confirm that you received all the equipment that is required to install the new NVMe expansion enclosure.

Table 1. Shipping package contentsColumn one lists the components. The other columns show figures of the components and list the quantity.
Component Quantity
NVMe expansion enclosureFront view of the NVMe expansion enclosure1
Rail kit, including
  • Snap-in rails (2)
  • Screws (2 per rail)
Snap-in rails1
Cable management arms Cable management arms2
Power cords, either
  • Black and gray C13/C14
  • Black and gray C13/C20

Power cords
2
Bezel for NVMe expansion enclosure (with key) Bezel for the NVMe expansion enclosure1
100G QSFP28 cables to connect the base enclosure to the NVMe expansion enclosure, the NVMe expansion enclosure to another NVMe expansion enclosure, and to loopback from the NVMe expansion enclosure to the base enclosure.
NOTE:The first NVMe expansion enclosure ships with four 100G QSFP28 cables. The second and third NVMe expansion enclosure ship with two 100G QSFP28 cables.
100G QSFP28 cables2

Rate this content

Accurate
Useful
Easy to understand
Was this article helpful?
0/3000 characters
  Please provide ratings (1-5 stars).
  Please provide ratings (1-5 stars).
  Please provide ratings (1-5 stars).
  Please select whether the article was helpful or not.
  Comments cannot contain these special characters: <>()\