CAUTION:This task on the system involves
powering off the SPs. When all SPs are down, all I/O services stop and hosts lose
access to the system. Once one or both SPs become available to the system, I/O
services to hosts resume.
Before performing this procedure, you should disconnect all network shares and LUNs from each host to prevent data loss. Once the system is fully powered up, you can reconnect the hosts to these storage resources.
WARNING:Pay careful attention when installing SAS cable
connectors into the system SAS ports. Improper installation can damage the chassis
requiring a complete chassis replacement. If you meet resistance when installing the
cable connector into the SAS port, ensure that you are installing the connector in
the correct orientation before continuing.
Data is not available for the Topic
Please provide ratings (1-5 stars).
Please provide ratings (1-5 stars).
Please provide ratings (1-5 stars).
Please select whether the article was helpful or not.
Comments cannot contain these special characters: <>()\