Start a Conversation

Unsolved

This post is more than 5 years old

P

2126

August 27th, 2010 13:00

Replication V2 (Celerra Replicator)

IHAC with following requirements for new NS480FC. All are on 5.6 using Rep v2.

They are replacing NS702G with new NS480FC. Plan is  something like this

(Point1) Existing production one-way replication between NS702g --> NS80G (will not be touched)

--Setup another new replication between NS702g -> NS480FC -> NS80G . this is without stopping the replication as per Point1

Pls note while doing this setup; still existing production replication would be running as per Point1

Is it supported since customer do not want to touch the existing environment or replication?

Kindly advise. Thanks in advance.

96 Posts

September 29th, 2010 11:00

Ref - to question as per earlier thread

Done replication and it was successful.

NS702g --> NS80G (existing replication - did not stop)

NS702g --> NS480FC (new replica for migration)

During cutover

did reverse from NS480FC -> NS702g

After this replication was running

NS480FC -> NS702g > NS80G

Redirected replication (by pushing incremental)

so now NS480FC > NS80G

shutdown NS702g

thanks

No Events found!

Top