Unsolved
This post is more than 5 years old
96 Posts
0
2126
Replication V2 (Celerra Replicator)
IHAC with following requirements for new NS480FC. All are on 5.6 using Rep v2.
They are replacing NS702G with new NS480FC. Plan is something like this
(Point1) Existing production one-way replication between NS702g --> NS80G (will not be touched)
--Setup another new replication between NS702g -> NS480FC -> NS80G . this is without stopping the replication as per Point1
Pls note while doing this setup; still existing production replication would be running as per Point1
Is it supported since customer do not want to touch the existing environment or replication?
Kindly advise. Thanks in advance.
pmenon5
96 Posts
0
September 29th, 2010 11:00
Ref - to question as per earlier thread
Done replication and it was successful.
NS702g --> NS80G (existing replication - did not stop)
NS702g --> NS480FC (new replica for migration)
During cutover
did reverse from NS480FC -> NS702g
After this replication was running
NS480FC -> NS702g > NS80G
Redirected replication (by pushing incremental)
so now NS480FC > NS80G
shutdown NS702g
thanks