SAN centralization

Hello,

I have 6 Emc disk arrays corresponding to 6 SAN networks, 2 of

them have integrated Brocade switches (Blade) and the rest are

normal switches, all in redundancy, how can I centralize all the

SANs and later on virtualize them. The aim is to get more flexibility

in affecting LUNs from one server (network) to the other network.

Thanks

COnsty

  • Consty

    2 Intern

    •

    232 Posts

    579

    0

    Posted February 10th, 2010 11:00

    Yes, 6 stand alone SAN switches not connected to other switches.

    Thanks

    Consty

  • dynamox

    11 Legend

    •

    20419 Posts

    •

    87439 Points

    579

    0

    Posted February 10th, 2010 11:00

    What kind of switches, what kind of arrays, what kind of blade enclosures ?

    This e-mail message (including any attachments) is for the sole use of

    the intended recipient(s) and may contain confidential and privileged

    information. If the reader of this message is not the intended

    recipient, you are hereby notified that any dissemination, distribution

    or copying of this message (including any attachments) is strictly

    prohibited.

    If you have received this message in error, please contact

    the sender by reply e-mail message and destroy all copies of the

    original message (including attachments).

  • dynamox

    11 Legend

    •

    20419 Posts

    •

    87439 Points

    579

    0

    Posted February 10th, 2010 11:00

    So 6 stand alone san switches, not connected to other switches ?

    This e-mail message (including any attachments) is for the sole use of

    the intended recipient(s) and may contain confidential and privileged

    information. If the reader of this message is not the intended

    recipient, you are hereby notified that any dissemination, distribution

    or copying of this message (including any attachments) is strictly

    prohibited.

    If you have received this message in error, please contact

    the sender by reply e-mail message and destroy all copies of the

    original message (including attachments).

  • Consty

    2 Intern

    •

    232 Posts

    579

    0

    Posted February 10th, 2010 11:00

    All the switches are Brocade : BR300, DS200B, Brocade 4GB 6+14ports, Silkworm 3250

    Blades are IBM HS21, HS22

    Arrays are CX300, CX500, CX3-40, CX3-80, CX4-480

    Regards

    Consty

  • Allen Ward

    6 Operator

    •

    2124 Posts

    579

    0

    Posted February 10th, 2010 12:00

    So, if I understand correctly (and forgive me for asking the same questions again a different way)...

    You have one switch attached to each array (with multiple connections?), with the hosts accessing that array connecting through that switch (with one connection or two each?)

    If this is correct, it may take some work to get things revamped to what it sounds like you want in the end. If the hosts have two HBA connections each, the ideal target state would be two have two identical fabrics with each host and each array connecting to both fabrics. Not sure if that works with the blade enclosures, but they may have to connect one to each fabric if not. If you only have one HBA from each host (and no option to put more in) then you will likely end up with one big fabric that all the switches and hosts attach to. Either way will allow any host can be provisioned from any array once the change is complete.

    I haven't worked hands on with any of the speific switch models you have, so I'm not absolutely certain of the interoperability without doing some more research.

  • Consty

    2 Intern

    •

    232 Posts

    579

    0

    Posted February 10th, 2010 14:00

    Each array (or SAN network) has 2 switches connected (redundancy),

    each server then has 2 HBA.

    Thanks

    Consty

  • Allen Ward

    6 Operator

    •

    2124 Posts

    579

    0

    Posted February 11th, 2010 07:00

    OK, I think I missed something there. Your original post indicated 6 arrays, and a follow up post indicated 6 switches, but this post says each array is connected to two switches.

    It might help if you could "diagram" your current environment for us something like this:

    CX300 - connected to 2 x 300B switches

    CX500 - connected to 2 x 200B switches

    etc.

    And I'm not sure how the Blade Chassis fit into the picture. Do they connect to another pair of switches for one of the arrays (using NPIV?), or do they connect directly to an array through the integrated switches?

    Sorry to ask so many questions, but the better we understand where you are starting, the better advice we can give on how to get where you want to be.

  • Consty

    2 Intern

    •

    232 Posts

    579

    0

    Posted February 12th, 2010 06:00

    1) CX300 - connected to 2 x Sikworm 3250

    2) CX500 - connected to 2 x DS200B

    3) CX3-40 - connected to 2 x DS200B

    4) CX3-80 - connected to 2 x integrated Brocade 4Gb (direct connection to the array)

    5) CX3-80 - connected to 2 x integrated Brocade 4Gb (direct connection to the array)

    6) CX4-480 connected to 2 x BR300

    Thanks

    Consty

  • dynamox

    11 Legend

    •

    20419 Posts

    •

    87439 Points

    579

    0

    Posted February 13th, 2010 13:00

    how are you doing on port count, any opportunies for consolidation ? (getting rid of 3250's maybe). None of your switches are true director class switches so i see some sort of mash fabric in your future.
  • Consty

    2 Intern

    •

    232 Posts

    109

    0

    Posted February 14th, 2010 10:00

    As I was saying in my first message, we can first consolidate

    and then virtualize. If necessary the switches will be changed.

    Regards

    Thanks

    Consty