How do I go about "skipping a day" of bacukps with NetWorker?
In a nutshell, network work will be performed on my system and the backup system will be effected. As such, I plan to shut down NetWorker services rather than disabling the multitude of groups I have. Upon startup of NetWorker (after the network is back online), will it attempt to start the groups that had been missed during the network outage? If so, how do I have it "skip" that evenings backup and go on with the next days schedule?
ble1
6 Operator
•
14354 Posts
•
56186 Points
119
0
Posted April 29th, 2009 04:00