Unsolved
This post is more than 5 years old
2 Intern
•
306 Posts
0
645
September 28th, 2009 06:00
Needing some clarity on setting Data Mover Load Notification
When setting up a Notification to send an email or SNMP alert... Specifically for Data Mover Load or Memory utilization, There is a START Interval and Interval Length.
I'm trying to understand if the interval length is the "END TIME".
For example. I have the Interval Start time set to 00:01 and the Length set to 23:59.
I want to be notified if the CPU reaches 95% and is sustained there for lets say...OOOOO... how about 5 minutes.
With that said, how can I set these alerts to get that ?
Thanks !!!
I'm trying to understand if the interval length is the "END TIME".
For example. I have the Interval Start time set to 00:01 and the Length set to 23:59.
I want to be notified if the CPU reaches 95% and is sustained there for lets say...OOOOO... how about 5 minutes.
With that said, how can I set these alerts to get that ?
Thanks !!!
No Events found!


MBLEIGH1
2 Posts
0
August 17th, 2010 07:00
This is a great question. Has this been answered?
Rainer_EMC
6 Operator
•
8.6K Posts
0
August 17th, 2010 09:00
looks like you want the SubInterval Method
Just press Help when you create the notification in Celerra Manager - then you can get the description of the fields:
Rainer
----
Select the computation method to use.
Type the length of time, specified in hours and minutes (hh:mm), and less than the interval length. Applies only to the SubInterval Method.
If all measurements exceed the limits in any subinterval of the interval specified by Interval Start and Interval Length, the specified action for the notification will be triggered.
Type the percentage of all readings within the specified interval that must exceed the specified limit. Applies only to the Percentage Method.
If this percentage, or more, of the readings within the specified interval, exceeds the specified limit, the specified action for the notification will be triggered.
All communications based on this notification (for example, alerts and email) contain this identifier.
Name of the Data Mover for which notification conditions have been set.
Type the time each day (hh:mm) to start monitoring CPU and memory usage.
Type the length of time (hh:mm) to monitor CPU and memory usage. The start time plus the interval length should not span midnight or you will receive a pop-up error.
Type the threshold used by the specified computational method to determine whether to trigger a notification.
Type the threshold used by the specified computational method to determine whether to trigger a notification.
MBLEIGH1
2 Posts
0
August 17th, 2010 10:00
thanks, I tried that after I posted this and there it was.