Unsolved
This post is more than 5 years old
20 Posts
0
12617
Looking for Power Down Instructions for CX4-240
I know a Power Down guide came with the SAN but I cannot find it and need to create a emergency power down playbook for the SAN. Any EMC guides or user created Power Down guides?
Thanks!
AranH1
2.2K Posts
0
August 11th, 2010 16:00
Brennan,
If you power down the DAEs before powering off the SPS (which shuts down the SPE and DAE-OS) then the array will lose connection to all the disks in the enclosures powered down. This would be very bad.
The proper procedure is to shut down the Storage Processors (essentially the array itself) by using the power switches on the SPS. When the power switches are triggered on the SPS this sends a signal to the Storage Processors to fllush all data to disk and shut down. Once the SPS, SPA, SPB, and DAE-OS have powered down, then and only then is it safe to power down the remaining DAEs attached to the array.
aloski
38 Posts
0
August 12th, 2010 18:00
Hi Brennan,
basically swap over steps 4 and 5
Paolo
aloski
38 Posts
0
August 23rd, 2010 19:00
Hi Brennan,
I may be too late, but I've attached a document we wrote long ago that is still valid even for newer clariion models.
Hope you find it useful.
Cheers, Paolo.
1 Attachment
CLARiiON SAN Power Cycle Procedure.doc
bluecrush111
1 Message
0
April 9th, 2015 10:00
bogus link now
dynamox
1 Rookie
1 Rookie
•
20.4K Posts
1
April 9th, 2015 11:00
things tend to change in 5 years