Unsolved
This post is more than 5 years old
45 Posts
0
1176
June 29th, 2008 05:00
Microsoft quorum and exchange LUN migration
Hi,
I want to migrate 2 LUNs, because now they reside on the Vault disks. These 2 LUNs are used for Microsoft cluster quorum disk and exchange information store. I was thinking about using lun migration to move them to new raid group, but since both are sensitive applications I'm worried of any downtime during the migration. I was making upgrade of the FLARE recently and at the end when the primary SP was starting Exchange lost its information store because the LUN is on the Vault drives.
I'm wondering is there any performance degradation or higher response time to the host during the migration process ?
I want to migrate 2 LUNs, because now they reside on the Vault disks. These 2 LUNs are used for Microsoft cluster quorum disk and exchange information store. I was thinking about using lun migration to move them to new raid group, but since both are sensitive applications I'm worried of any downtime during the migration. I was making upgrade of the FLARE recently and at the end when the primary SP was starting Exchange lost its information store because the LUN is on the Vault drives.
I'm wondering is there any performance degradation or higher response time to the host during the migration process ?
No Events found!


amrith
1 Rookie
•
76 Posts
0
June 29th, 2008 23:00
May be do it at non-peak hours which will help further ,
RRR
6 Operator
•
5.7K Posts
0
June 30th, 2008 03:00
HIGH means 3MB/s = 10GB per hour, but pperformance impact can be noticible
ASAP = means as fast as the Clariion can go and this will have an impact. the speed I noticed was 120MB/s (not 350 as mentioned in the white paper) on a RAID10 (3+3) set of 15k drives to a new empty RAID10 (3+3) set of 15k drives.
LOW means really really slow and this means a migration can take up to days or even weeks, but impact is low as well. I doubt you will even notice it.
mpi2
2 Intern
•
215 Posts
1
June 30th, 2008 03:00
Lun Migration is the best choice for your situation.
You can consider two ways:
-) make the migration after midnight (or whenever you can afford a performance degradation) with "ASAP" setting.
-) make the migration during the day doing with "low" priority. With this setting you should not see any performance impacts.
You can search for the Whitepaper "The Influence of Priorities on EMC Clariion LUN Management Operations" on powerlink where you get detailed information of priority settings and the duration of migrations.
Best Regards
Manfred
bstoyanov_393481
45 Posts
0
June 30th, 2008 04:00
RRR
6 Operator
•
5.7K Posts
0
June 30th, 2008 04:00
RRR
6 Operator
•
5.7K Posts
1
June 30th, 2008 04:00
So "from the outside" you don't even know any difference, except perhaps performance. And yes, you can do this without any downtime at all.
bstoyanov_393481
45 Posts
0
June 30th, 2008 05:00
RRR
6 Operator
•
5.7K Posts
0
June 30th, 2008 06:00
Response times are slighty higher, but that can be tuned. The white paper "The Influence of Priorities on CLARiiON LUN Management Operations" clearly mentiones the possibilities.