I have received compellent SC40 boxes (two cotrollers, two SAS enclosures). I have mounted the equipment, have done the backend/frontend cabling. Now whats next, what should i do now???
Where as i understood from the documentation i need to download/install Enterprise Manager, i already have the license keys. Will the Enterprise Manager allow me to configure the boxes or i need to do some thing else.
Can you please give me the brief checklist/steps i need to perform for the configuration of compellent like below:
Usually, when purchasing a new Dell/Compellent array, installation services is included. So check with your account management team to see if those services were purchased along with the array. If not, the installation process is actually rather simple and is very well documented in the Storage Center 6.1 System Setup Guide document in the Compellent Knowledge Center.
dell_Gnat
1 Message
768
1
Posted December 5th, 2012 04:00
Usually, when purchasing a new Dell/Compellent array, installation services is included. So check with your account management team to see if those services were purchased along with the array. If not, the installation process is actually rather simple and is very well documented in the Storage Center 6.1 System Setup Guide document in the Compellent Knowledge Center.