I want to fail controller 0 to controller 1 on a production equallogic array (during a maintenance window). Is there a way to failover a controller without having to pull power on the controller?
Thanks,
Adam Feind
Midway ISD
Thanks,
Adam Feind
Midway ISD
No Events found!


Joe S586
9 Technologist
•
729 Posts
1
October 11th, 2010 08:00
afeind
3 Posts
0
October 19th, 2010 12:00
I am wanting to verify my iscsi pathways on the switches, servers, etc.
Adam
Joe S586
9 Technologist
•
729 Posts
0
October 19th, 2010 13:00
Just remember that when you restart a member, the group sets any volumes with data on the member offline (for 15-20 seconds), and fails over to the secondary controller. The group sets the volumes online when the restart completes. Restarting a member has no effect on member, volume, or group configuration information or volume data stored on the member. So as long as you have the iSCSI disk timeout setup properly the host will ride out the restart.
chamambom
1 Message
0
December 28th, 2016 02:00