UNSOLVED

Joshko410

updated

4 years ago

J

Joshko410

3 Posts

0

779

November 14th, 2022 07:00

Back up reports

I manually check the monitoring each day to verify pass or fail of backup jobs and keep track with a check list. Is there a way to have networker export daily reports of pass/fail of jobs to an excel file?