Best practices for overheated server room ?
Our management wants to shutdown all power to our server room if tempertures rise beyond a preset point. This is to save equipment if there is ever a problems with our air conditioning systems.
Is this a common procatice? We have 3 Dell SANS and 50 servers in this server room.
Thanks,
John
No Events found!


Dev Mgr
6 Operator
•
9.3K Posts
•
3 Points
0
January 30th, 2006 18:00
- 1 FC-series Dell|EMC array with 1+ DAEs
- 2 CX-series Dell|EMC arrays with 1+ DAEs each
- 10 fibre connected hosts
- 5 non-fibre connected hosts
- 1 tape library
- 2 fibre switches
This is just an example, but for a setup like this the power down steps should be:
- power down all hosts (servers) properly
- power down the library
- power down the DPE/SPE (SPE would include a DAE-OS) using the SPSes
- power down the DAEs
- power down the fibre switches
- power down any other equipment (ethernet switches, etc)
Message Edited by Dev Mgr on 01-30-2006 02:09 PM
UW
2 Posts
0
January 31st, 2006 11:00
What i mean is...they want to shut down all equipment via a main breaker. "Click"
I've told them there will probably be data loss on the SAN, but htey seem to more concerned that the equipment is not damaged and say the data can be restored.
Thanks,
John
bltserv
31 Posts
0
February 8th, 2006 16:00
We used a E-mail alert when the temp reached a
critical level. E-mail to Cell phone. Then that person
B-lined and shut it down correctly. Happened twice.
bltserv