Moving to a new UPS

The UPS where my VNXe is telling me it is failing.  Currently, both power supply are connected to a single UPS. I wanted to power my VNXe using 2 separate UPS going forward.  I am hoping that I don't need to schedule any downtime to do this.  Since there are 2 power supply, am I correct in assuming that I can unplug one power supply, say DPE Power supply B and plug it to a new UPS without powering down the whole DPE?  After a few minutes, I will unplug the Power supply A from the old UPS and plug it to another new UPS.  Will that cause any problem?

Thanks

Vince

2 Intern

 • 

715 Posts

April 8th, 2015 16:00

Yes, the Power supplies are shared and redundant. If one fails or you move it's power source, the surviving one provides power to both SP's.

When you move PS-B to the new UPS, wait until any fault conditions (leds) normalize then do the other. As you've said, a few minutes should be sufficient.

1 Rookie

 • 

12 Posts

April 10th, 2015 06:00

Thanks.  Working perfectly