
UNSOLVED
ISL and switch discovery
Hi,
We are trying to add another 4500 to our existing Tape environment (3 Mcdata 4500). I have allocated 6 ports to get the new switch ISL'd. The new switch has been powered and the network cable attached.
Can somebody help me with the TODO list before/after ISL'ng?.
Thanks.
We are trying to add another 4500 to our existing Tape environment (3 Mcdata 4500). I have allocated 6 ports to get the new switch ISL'd. The new switch has been powered and the network cable attached.
Can somebody help me with the TODO list before/after ISL'ng?.
Thanks.
Responses (0)
Solutions (0)
