
UNSOLVED
ISL and switch discovery
Hi,
We are trying to add another 4500 to our existing Tape environment (3 Mcdata 4500). I have allocated 6 ports to get the new switch ISL'd. The new switch has been powered and the network cable attached.
Can somebody help me with the TODO list before/after ISL'ng?.
Thanks.
We are trying to add another 4500 to our existing Tape environment (3 Mcdata 4500). I have allocated 6 ports to get the new switch ISL'd. The new switch has been powered and the network cable attached.
Can somebody help me with the TODO list before/after ISL'ng?.
Thanks.
Responses (2)
Solutions (0)

tazal
59 Posts
139
0
Posted October 14th, 2008 12:00
In the absence of a more useful and complete answer make sure you check the interop mode and domain id of the switches. The interop modes have to match on all switches in a fabric and the domain ids have to be unique.
The good news is that the mcdata switches are very good about not merging fabrics if any pre-checks fail. If it does fail then the switch will likely show "invalid attachment" and have an additional message that will give you a clue as to why it failed.