Does anyone has experience with NetWorker 8.1 and the new VMware Backup integration with the VBA (VMware Backup Appliance)?
I already did the integration with the internal VBA proxy appliance and two external proxy appliances to get a maximum of 24 concurrent sessions, but somehow the VBA internal appliance does not balance the other queued jobs to the external proxies and its always running with 8 concurrent sessions. From the Appliance side is not much to configure and the external proxies only need to be registered to the VBA appliance. The load should be automatically distributed between the internal/external proxies if there are more than 8 sessions in parallel but it doesn´t.
Any help/information would be greatly appreciated.
Of course i can answer this as i´m now playing since more than six months with this pretty nice stuff
The concurrent option allows you to process mulitple VM´s concurrently at the same time, mostly up to 8 or with two external proxies (recommendation) up to 24 VM backups in parallel. If this option is not applied only one VM after the other will be backed up.
Information from the VMware integration Guide:
To avoid waiting until all backups complete before the clone action begins, you can choose to make the operations concurrent, similar to NetWorker’s immediate cloning option which allows a group to start cloning upon each save set completion.
To enable and mark actions to run concurrently with their preceding actions:
1. Open the Create VMware Policy or Edit VMware Protection Policy window.
2. Select the appropriate checkboxes under the Definition tab, as shown in Figure 20 on
We also have recently set up this configuration (one EBR Application with one external proxy) and the savestream are well balanced between the 2 VM (16 savestream concurent).
Are you sure you are linked your external proxy to the VBA?
Thanks for your feedback. I´ve already forget about this entry but we were able to fix the issue. We had to restart the avagent service on the external proxies and afterwards it was working properly.
Would be nice if you could share some experience/information from the EMC World 2014 Keynotes like NetWorker 8.2 which should be available at least until the end of the second Quarter of 2014.
I think the community will appreciate it very much.
schallean
1 Rookie
•
43 Posts
2166
0
Posted May 8th, 2014 13:00
Hi Greg,
Of course i can answer this as i´m now playing since more than six months with this pretty nice stuff
The concurrent option allows you to process mulitple VM´s concurrently at the same time, mostly up to 8 or with two external proxies (recommendation) up to 24 VM backups in parallel. If this option is not applied only one VM after the other will be backed up.
Information from the VMware integration Guide:
To avoid waiting until all backups complete before the clone action begins, you can choose to make the operations concurrent, similar to NetWorker’s immediate cloning option which allows a group to start cloning upon each save set completion.
To enable and mark actions to run concurrently with their preceding actions:
1. Open the Create VMware Policy or Edit VMware Protection Policy window.
2. Select the appropriate checkboxes under the Definition tab, as shown in Figure 20 on
page 54.
From:
EMC® NetWorker and VMware
Release 8.1 SP1
Integration Guide
P/N 302-
Hope that helps.
Best regards from Austria
Andi