NDU refers to Non-Disruptive Upgrade , for further instruction please refer to the link mentioned above for generating customised document .Also refer to solution article emc36714.
SP-B will be rebooted first. All LUNs belonging to SP-B will be trespassed to SP-A. Once SP-B is back on-line SP-A will be rebooted next. SP-A will be trespassed to SP-B. Once SP-A is back online verify that the LUN's whos default owner is SP-A are now owned by SP-A.
Correct. Just make sure that each host that is connected to the SAN has failover software (i.e. PowerPath) loaded and that each host can see paths to SP-A and SP-B and you'll be good to go.
Yes, use the USM for adding DAEs, it will help to make sure you don’t cause an outage by accidentally configuring the DAE with a duplicate ID# or other common mistakes.
There is no SP Reboot required for a DAE add on. The DAE is connected to the end of an existing backend bus, daisy chained to the last DAE on that bus, or directly to the SP if a bus has no DAEs already connected. Since you are not removing any existing DAEs, there will be no cables disconnected and as such, no outage.
Same goes for adding drives, you can add drives any time without downtime as long as there are free slots.
The key thing to do is: Check the disk/flare interoperability matrix on PowerLink to be sure that your FLARE version supports the drives you are planning to add. A FLARE code upgrade can also be done with USM, but it WILL require an NDU, which reboots each SP one at a time. In order to be sure your hosts do not lose connectivity during an NDU, each host must have a SAN path to BOTH SPs, and have path failover software configured. (EMC PowerPath, Windows MPIO, Linux Native-MPIO, VMWare NMP, etc.) If properly configured, the hosts will follow the LUN trespass between the SPs during the upgrade.
Again, the DAE install and drive adds themselves do not require an NDU, they are simply added to the system hot.
gangas3
21 Posts
708
0
Posted February 16th, 2012 06:00
To add additional enclosure you dont require down time . This is NDU process .
Yes NDU process will reboot Sp one after the other.
To create customized documentation that contains step-by-step instructions for adding a hardware part to your storage system please follow the link.
http://powerlink.emc.com/km/live1/en_US/Offering_Technical/Technical_Documentation/cx3_cust_doc_upgrade.htm