NS20 Power On

What is the right procedure to power on NS20?

First Storage-> Blades -> SPA/SPB-> Control Station. Is it correct?

  • dynamox

    11 Legend

    •

    20419 Posts

    •

    87439 Points

    468

    1

    Posted March 6th, 2010 06:00

    Reverse the order you used to power it down

    1) turn on cabinet circuit breakers

    2) reconnect power to all DAE3P from PDU , this will spin up the disk. I wait until they all stop flashing before I go to step 3

    3) turn on power switch on SPSs (wait a couple of minutes as well)

    4) reconnect power cables to datamovers (wait 5 minutes and go to step 5)

    5) reconnect power cables to control station