We were using client schedule override (savegroup setting) in NW 8.x for non-daily backups.
Setting this override eg. for weekly backups is very useful, because this way in NMC the failed savegroup run will remain in failed status. If this option is not set the 'skip run' will turn the "red cross" into "green tick" on the next day on monitoring screen.
Unfortunatelly I can't find a way to achieve the same results in NW 9.1.
I do not understand what you want to achieve. And this is probably true for most of the readers.
In NW 8.x within the savegroup properties you have the possibility to override the client schedule.
However, the backup result should be the same, no matter which schedule you use.
But you obviously want to achieve a 'failed' result for whatever reason. This seems to be weird as normally an admin's intention is to have as few error as possible.
So first we need to understand why a failed workflow would be beneficial for you at all ...
If I understand you well you would like "Skip" level action to not change status of Workflow and Policy in NMC as it used to work for older version. And when you have a look at NMC Monitoring tab on Monday you want instantly see if the backup was successful or not on Friday and the failure to be preserved until resolution.
I am not sure what is the status for the moment if this is working as expected for NetWorker 9 because some design reasons like:
Level "Skip" is a valid level, a successful Skip is a valid outcome , a successful operation and a true reflection of the last Workflow execution, "doing nothing" is actually yes doing something... "we are doing the Skip"
OR
It is a bug at NMC reporting wrong status for Skip level and you need to reach engineering through a formal service request and escalation.
There are two Request For Enhancement (RFE) opened for this, product management response was : "seems to be a bug as NMC reporting wrong status"
For now I can see you have two options:
- Work this through a formal service request with DellEMC support trying to get engineering involved and loot at it.
- Work with your presales/account manager to check the latest status of RFE with product management.
I believe it's the question of design and if it's so, then I guess it won't change in the near future .
I agree with your statement regarding 'Skip' level: it's OK that it is a valid operation, but luckily there was a "workaround" in NW8 (the override, which caused that the savegroup execution was skipped).
In NW9 the solution would be more complicated, because we have 4 (nested) statuses: Policy->Workflow->Action->Client. Perhaps the Action should preserve its status in NMC until it is really started.
According to the logs the Action is not started in case of a skip schedule, but the Workflow status is always updated.
I think NMC is working as designed, but unfortunately it is really not user friendly.
I'm wondering why other admins are not pushing EMC harder to do something with that.
Just to set expectations, you might need to be prepared... it might take some time to follow troubleshooting or review and internal support escalations workflow, especially when a design or working as expected is suspected... but hopefully it will reach engineering to get a clear statement.
If I'll find something new regarding will let you know
Apparently looks like a design decision on new NetWorker 9 concept, however checking the Request For Enhancement (RFE ) status seems Product Management recommended for a formal Service Request via Support and so an escalation can reach engineering to have a look at it. Some other customers requested the same and DellEMC System Engineers already raised the flag.
You can be the one that can trigger this investigation and open a formal service request, that way other backup admins can benefit and get an official answer either design or bug .
For the moment yes, looks like you cannot change that much. Well... you have the option of DPA , but I can understand where this request is coming from.
Can you please help me with the Service Request? How can I escalate efficiently the ticket to someone who can really support me? The support told me that I have to disable autostart and run all of my non-daily backups manually...
bingo.1
1 Rookie
•
2430 Posts
5485
0
Posted January 10th, 2018 06:00
I do not understand what you want to achieve. And this is probably true for most of the readers.
In NW 8.x within the savegroup properties you have the possibility to override the client schedule.
However, the backup result should be the same, no matter which schedule you use.
But you obviously want to achieve a 'failed' result for whatever reason. This seems to be weird as normally an admin's intention is to have as few error as possible.
So first we need to understand why a failed workflow would be beneficial for you at all ...