We have several PS4100 and PS6100 arrays (some stand alone, some grouped) that are 'legacy' and are configured for RAID-5. We are using more robust RAID configurations on more current SAN's however we want to know if anyone has any experiencing migrating large sets of data or if Dell provides any ability to migrate RAID-5 to RAID-6 or provides any kind of service to perform this type of migration.
Since there appears to be no way to migrate the raid level from 5 to 6 on the PS series SAN's, the only option I can think of is to buy another SAN equivalent to our largest array with RAID-5, add it as a member, and delete the member running RAID-5 so that the data will be migrated to the other members. This seems like a pretty costly solution, maybe Dell has loaner SAN's for this purpose?
Sorry but you we cannot reduce the size of the raidset when converting and can't go from a larger capacity RAID level like 5 to a smaller one like R6. This has never been supported.
Please check with your Sales consultant about a loaner and/or on-site help with this if you don't have a spare array on hand.
To convert, you need to do the “offline migration method”, i.e., adding a member to the group, then vacating the R5 member, reconfiguring it for R6, add the member back into the group. As you indicated, you need enough space on the remaining member to hold all the data. Or have a member in the group that can hold all the data of the R5 member, while you do the conversion.
If you don’t’ have another member, you would need to backup/copy the data off the member, and vacate the member from the group, and reconfigure for R6, then restore your data.
You can save the member configuration and restore the settings (CLI tool, called save-config). Check out the CLI guide to see what is saved.
Joe S586
9 Technologist
•
729 Posts
1001
0
Posted January 31st, 2013 13:00
Sorry but you we cannot reduce the size of the raidset when converting and can't go from a larger capacity RAID level like 5 to a smaller one like R6. This has never been supported.
Please check with your Sales consultant about a loaner and/or on-site help with this if you don't have a spare array on hand.
To convert, you need to do the “offline migration method”, i.e., adding a member to the group, then vacating the R5 member, reconfiguring it for R6, add the member back into the group. As you indicated, you need enough space on the remaining member to hold all the data. Or have a member in the group that can hold all the data of the R5 member, while you do the conversion.
If you don’t’ have another member, you would need to backup/copy the data off the member, and vacate the member from the group, and reconfigure for R6, then restore your data.
You can save the member configuration and restore the settings (CLI tool, called save-config). Check out the CLI guide to see what is saved.
-joe