This is an old-ish thread, but it might be worth checking out if you have a dynamic Smart Group as part of your run criteria.
I had a similar condition where it would first run generate a Smart Group ahead of a scheduled...and the Smart Group failed to populate, halting everything. None of this was referenced directly in the logs, curiously enough.
J_H_
2 Intern
•
498 Posts
0
June 26th, 2014 15:00
I had that issue when we migrated from 5 to 6,
in 6 my reports that worked no longer emailed but I could test.
I ended up having to go remake the report.
J_H_
2 Intern
•
498 Posts
0
July 9th, 2014 13:00
V6.1.0 (Build 81945)
rjacob1
39 Posts
0
November 25th, 2014 08:00
Is the schedule set to your time zone? By default it is set to EMEA timings.
markbowytz
11 Posts
0
February 17th, 2015 12:00
This is an old-ish thread, but it might be worth checking out if you have a dynamic Smart Group as part of your run criteria.
I had a similar condition where it would first run generate a Smart Group ahead of a scheduled...and the Smart Group failed to populate, halting everything. None of this was referenced directly in the logs, curiously enough.
Rogerio_Ferrei1
2 Posts
0
March 4th, 2015 03:00
I have the same Problem EMC asked to update version 6.1.1 to 6.2.