Unsolved

This post is more than 5 years old

1 Message

559

October 14th, 2019 15:00

PC 5548 - Add a Secondary Connection to Core Switch

My Goal:

We have a Dell PC 5548. Currently it is connected back to the core Switch from port Te 1/0/1 (1GB) (Dell S4048-N) via another switch. We recently add a new fiber (10GB - Te 1/0/2) cable from the Core Switch (S4048-On) to the 5548. We want to make that new connection as Primary and keep the other as a secondary. I cannot to aLAG because of the speed issues with the cables.

Can i assign Path Cost or priotirty to the port to only use Te 1/0/2 first if not connection then use Te 1/0/1. I do not want create a loop.

 

Thanks.

Moderator

 • 

9.6K Posts

 • 

42.5K Points

October 15th, 2019 09:00

Hi,

Page 459 https://downloads.dell.com/manuals/common/powerconnect5500_cliref_en-us.pdf spanning-tree cost should let you do this.

No Events found!

Top