Hi all, 

 

Currently, we have 4 VxRail nodes that are connected to single uplink switch (Dell N1548T). We are planning to replace them with 2 Dell S4112T-ON switches.

Can I get any Ideas or suggestions to carry on this activity without downtime? If downtime is required then what will be the minimum time to complete the activity. 

Below is table that shows which traffic is going out of which physical NIC on the VxRail nodes. Distributed switch and port groups are configured accordingly.

ChethanM_0-1657264196287.png

Thank you

 

4 Operator

 • 

2.7K Posts

July 8th, 2022 07:00

Hello @ChethanM,


I think you should wait for a Community answer if your question is about an installation or implementation. Otherwise, if you need to help of professional services for the installation and configuration of the two S4112T-ON switches you may consider contacting with the Commercial department or a Dell partner and ask for a quote regarding the deployment with miniman downtime.


Meanwhile, here you have some documents that I hope you find interesting: S4112–ON Series Installation Guide January 2019 - https://dell.to/3ARplWb and Dell EMC S4112–ON Series Installation Guide October 2021 https://dell.to/3AzdYlg


Regards.

 

7 Posts

July 19th, 2022 04:00

Sure. Thanks for the documents.