I configured a lot of clone sessions within networker.
Most of the clone jobs work fine but I got also some clone jobs which fail after a couple of seconds.
Strange thing: Networker backed up a group called "group01" yesterday. When I try to clone this group "group01", it won't work although I define the option "Include save set from the previous 7 days".
Inside the clone object I selected the networker group and the pool where the clone should reside. Other clone jobs with the same configuration operate succesfully.
In the networker log is no failure message, just the message that the clone jobs starts.
12/07/12 09:10:50 2 0 0 3968234032 15851 0 nwserver nsrtask [clone.Oracle_xyz] Completion status of job 214575 not available. Trying again in 2 seconds. 7 attempt(s) left
12/07/12 09:10:52 2 0 0 3968234032 15851 0 nwserver nsrtask [clone.Oracle_xyz] Completion status of job 214575 not available. Trying again in 4 seconds. 6 attempt(s) left
12/07/12 09:10:57 2 0 0 3968234032 15851 0 nwserver nsrtask [clone.Oracle_xyz] Completion status of job 214575 not available. Trying again in 8 seconds. 5 attempt(s) left
12/07/12 09:11:05 2 0 0 3968234032 15851 0 nwserver nsrtask [clone.Oracle_xyz] Completion status of job 214575 not available. Trying again in 16 seconds. 4 attempt(s) left
12/07/12 09:11:21 2 0 0 3968234032 15851 0 nwserver nsrtask [clone.Oracle_xyz] Completion status of job 214575 not available. Trying again in 32 seconds. 3 attempt(s) left
12/07/12 09:11:53 2 0 0 3968234032 15851 0 nwserver nsrtask [clone.Oracle_xyz] Completion status of job 214575 not available. Trying again in 64 seconds. 2 attempt(s) left
12/07/12 09:12:58 2 0 0 3968234032 15851 0 nwserver nsrtask [clone.Oracle_xyz] Completion status of job 214575 not available. Trying again in 128 seconds. 1 attempt(s) left
12/07/12 09:15:06 2 0 0 3968234032 15851 0 nwserver nsrtask [clone.Oracle_xyz] Exiting 'nsrtask', process 15851 on nwserver
I don't understand the message "no complete save sets to clone". The database I'm trying to clone is backed up every day and there are complete save sets for sure.
Have you tried to clone only one of the savesets included within the date specified in the nsrclone command?
If so, what is the output?
There is a chance that the savesets are marked as suspect, and for that reason the savesets don't get cloned, however I think that the problem is the command issued. Some of the flags are not correct or the flags added return no complete or not matching savesets:
As per documentation, that output means:
no complete save sets to clone
Only complete save sets can be copied, and no complete save sets were found matching the requested command line parameters.
So I would revise the command line and maybe use either less values or more accurate values instead.
If you check one SSID and specify that in the command line, instead of the completion times, dates etc, just the SSID with the destination pool etc should work fine.
I have tried to clone just one save set and it worked.
I believe that the clone goes into a failed status when the clone has no data to clone. For example, one clone cloned yesterday a couple of save set and went into a succeeded state. The same clone ran today again and went into the failed state. The database i wanted to clone in this example had no scheduled backup for today but for yesterday. Do you know what i mean?
However, I tried to set the flag "continue on save set error" but this had no improvement.
I got appr. 25 important databases which are backed up every day at night from networker. After the back up jobs around six in the morning I wanna start the clone jobs. So I have for every database backup job one clone job.
I would have to research clone job failing of no savesets to clone is correct, however I don’t see why you need 25 separate cloning jobs to achieve the clones of the important databases you want. Although these are all started from different groups I would assume you don’t have 25 different pools but use 1. If this is the case then setting the scheduled clone to pick the relevant savesets from the pool would be better and also stop failure if a specific database backup failed or was suspended for business reason for some reason - which I assume was the reason for no savesets being available?
Within networker I have 50 database backup groups. 25 groups for daily database backup and 25 groups for archive log backup which are running every 10 minutes. All jobs are scheduled by an job handling software (UC4). There are two pools where the data is stored in, one pool for the database backups and one for the archive logs.
So I created for every database two clone jobs (database clone and archive logs clone) means a total 50. Every clone job is configured equal. Only storage node and pool differ.
So these clone jobs get started by the job handling software (by executing nsrtask clone.oracle_xyz) every morning at 6 o'clock. And I find every morning a different situation. Today for example 19 clone jobs went into the failed status right after they were started. Sometimes just a few fail, other days over 25 fail. And I can't see any context.
OK - I think I now understand. Each scheduled clone job queries the Media Database to see what savesets it has to clone given the parameters you can set when setting up the scheduled job.
In your case it identified several savesets which in total were 350GB - this completed successfully.
You then re-ran the job and it failed as there were no savesets to be cloned - you had just cloned them all with the previous job and I am assuming no further backups had been taken.
I guess a more eloquent way to end would be to report no savesets to clone rather than fail but other logic could say we are expecting something to be there therefore highlight with a fail the fact there is no data to clone?
A failure of sorts but as there is nothing to clone you can ignore.
OK - so your archive log pool volume/s should always have backups on them which require cloning and also the database pool volumes also as it would be unlikely all database backups did not run or all failed.
Depending on the storage nodes which do the backups and that used for cloning there maybe an issue with volume access to allow the cloning to proceed.
Archive log backups are usually very small and therefore to fill a physical tape this can take some days. As they run every 10 mins this means the volume is most likely in use for a backup and therefore may not be available to be read to do the clones.
Do the Database backups complete before 06:00 each day? If not then I would suggest we delay the cloning as with the same pool we could be writing to volumes also.
I would also within your scheduler stop the archive log backups for say 1 or 2 hours and run the cloning here when the volumes will only be required for cloning. NetWorker has in built logic which where backups take preference over cloning - therefore start a clone and the volume required for his is also required for backup - clone will be suspended once the savesets at that time are finished and backup will go forward.
Its probably a scheduling/conflict which is giving you the unpredictable results which is compounded by the number of jobs you have and the "limited volumes" used for the backups.
Consider just having two cloning jobs - for archive log and database pool as previously suggested as you end up with the copies you need.
CarlosRojas
1693 Posts
2184
0
Posted July 11th, 2012 00:00
Hi Jan,
Have you tried to run the nsrclone command manually from command line and with debug options?
Have you tried to clone some savesets from NMC?
Do you have any output in the nsrtask.raw or anything in the daemon.raw?
Thank you.