The time required for a rebuild depends on the amount of data being rebuilt. The higher the capacity utilization on the system, the longer the rebuild will take. Backups can continue to run while a rebuild is running but maintenance must stay suspended.
For a 7.8TB node system that is near the capacity warning threshold, a node rebuild could take approximately 5 days (depending on exactly how full the system is, as I said earlier). Smaller node types will rebuild more quickly, as will systems with lower capacity utilization.
ionthegeek
2 Intern
•
2K Posts
1
October 30th, 2012 05:00
The time required for a rebuild depends on the amount of data being rebuilt. The higher the capacity utilization on the system, the longer the rebuild will take. Backups can continue to run while a rebuild is running but maintenance must stay suspended.
binodprasai
17 Posts
0
October 30th, 2012 13:00
Thanks for your reply
Dose number or the nodes in the grid impact the rebuild process?
Is there estimated time?
ionthegeek
2 Intern
•
2K Posts
0
October 30th, 2012 14:00
For a 7.8TB node system that is near the capacity warning threshold, a node rebuild could take approximately 5 days (depending on exactly how full the system is, as I said earlier). Smaller node types will rebuild more quickly, as will systems with lower capacity utilization.