Hello all,
I am very new to Recoverpoint and need some help here .
Customer has plans to run a DR test and would like to write to their secondary site and discard the changes done .
And after a month or so failover again , but this time they want to run on the DR for a week and then failback .So all the production activity will be running from DR site for a week .
What should be a proper DR plan for both the activities .
Here is the set up -
FC connected VNX1 at both the sites (remote replication) replicating via RP (v4.4).Only two node oracle hosts are attached to the VNX .
There are 4 CG. Also, no SRM .
Please let me know what are the initial information that I need to collect and what be the strategy to do a failover .
If possible please share some documents ot links pertaining to RP DR without using SRM .
Thanks in advance .