Looking for any documentation or specific settings or tweeks for a deployment involving
Hitachi HDS Storage
Brocade SAS
RecoverPoint.3.3. sp2 on Gen 1 hardware
Specifically port settings on the Hitachi that connect to the RPAs
How to properly add multiple Hitachi Arrays so that RP sees them correctly (We tried doing 3 separate arrays all at once, zoned the same way and it said it couldn't b/c the port contained initiator and target ports) Once we removed the other 2 arrays it was able to continue the deployment. Now we need to add the other 2 arrays back.
Need more specific info on setting up or verifying the settings are correct on the Hitachi array to work properly with RP.