
UNSOLVED
F
flauridsen
19 Posts
0
1245
January 31st, 2013 09:00
Steps for DR failover test with Mirrorview/A
I would like to test DR site failover with Mirrorview/A..
What would be the steps needed to test with Mirrorview and then restart the syncronization after the test.
I would not want the changed data coming back to the production site.
Force Promote? the DR site.
Thanks
Fred
Responses (0)
Solutions (0)
