It's strange to make this change. then if we want to back up the changed data day by day, how can we do? I'm wondering if I can configure the LEVEL in the Client properties.
Level backups have been deprecated from NW9 onward and are no longer available for configuration. Cumulative incremental is the way to go which is level 1.
bingo.1
2.4K Posts
0
December 26th, 2017 13:00
yes, you are right. Even if you upgrade an existing versions, the only level which will remain is level 1.
Consequently, the new level "cumulative incremental" will in fact perform level 1 backups.
For differentials this is all you should need.
HePeng1
1 Rookie
•
52 Posts
0
December 26th, 2017 17:00
It's strange to make this change. then if we want to back up the changed data day by day, how can we do? I'm wondering if I can configure the LEVEL in the Client properties.
SurajPujari
155 Posts
1
December 27th, 2017 18:00
Level backups have been deprecated from NW9 onward and are no longer available for configuration. Cumulative incremental is the way to go which is level 1.
Refer page 5:
https://www.emc.com/collateral/TechnicalDocument/docu61115.pdf
HePeng1
1 Rookie
•
52 Posts
0
December 27th, 2017 19:00
OK, thank you all.