Kill pending task in ViPR?

Is there a way to stop a Tenant task in ViPR when it's obvious that the job has otherwise failed? I ran two jobs to create new volumes on a virtual VNX array from vRA in an EHC environment.

vRA showed that both jobs had failed immediately, but I can see that ViPR still shows them as Pending.

pendingvipr.PNG.png

ViPR lists the two volumes (both 0B in size) in its inventory. I can't delete either of them from the inventory because they both have Create Volume tasks that are still ostensibly running, but I can't kill those tasks either, and after 16+ hours runtime with no further progress it doesn't look like either task will timeout on its own either.


Thanks in advance!


james.walkenhorst@emc.com

46 Posts

June 20th, 2016 08:00

Hi James,


I recommend opening a case with support since there is some manual intervention with the ViPR Controller database involved.


Thanks,
Frank