PowerFlex: Power Off\ShutDown Management Node\Database

Oversigt: Use the following procedure to fully power off\on the nodes in an integrated PowerFlex management (non-KVM) deployment.

Denne artikel gælder for Denne artikel gælder ikke for Denne artikel er ikke knyttet til et bestemt produkt. Det er ikke alle produktversioner, der er identificeret i denne artikel.

Instruktioner

Steps can be found in the admin guide 
Caution: This procedure shutdown the database 3 instances on the 3 MVMs for full shutdown, if you meant to do a rolling restart for the 3 MVM instead without shutting down the database use the following article PowerFlex 4.X: How to Perform a Graceful Reboot on PFMP MVM Management VMs

Power off nodes in an integrated PowerFlex management (non-KVM) deployment
Caution: When you fully power off the PowerFlex system, you lose all access to your PowerFlex cluster.
Steps
  1. Stop all external workloads. Dell Technologies recommends that you unmount the volumes for the SDCs.
  2. Log in to any PowerFlex Manager node using SSH.
  3. Stop the PowerFlex Manager database.
    Note: Once the PowerFlex Manager database is stopped, the PowerFlex Manager user interface is unavailable, and you cannot authenticate to the MDM cluster.
     
    1. To gather the IP address of the database service, run these commands:
      export NAMESPACE=powerflex
      export DBSA_IP=$(kubectl get service/postgres-monitor-leader -n $NAMESPACE -o jsonpath='{.spec.clusterIP}')
      
             
      
            
    2. To shut down the database pods and service, run this command:
      curl -i -H "Accept: application/json" "http://$DBSA_IP:8080/pgclustershutdown"
      
            
    3. To check the shutdown status, run this command:
      curl -i -H "Accept: application/json" "http://$DBSA_IP:8080/pgclustershutdownstatus"
      
            
    4. Continue to run the shutdown status command until the command returns a verified status.

    The following example output shows a verified status:

    HTTP/1.1 200 OK
    Date: Mon, 05 Aug 2024 18:36:14 GMT
    Content-Length: 47
    Content-Type: text/plain; charset=utf-8
    {"return_status":0,"startup_status":"verified"}
    
        
  4. Power off all nodes.
    Note: Nodes running PowerFlex management platform processes may take longer to shut down than simple SDS nodes.

Power on nodes in an integrated PowerFlex management (non-KVM) deployment
 
Steps
  1. Power on all SDS nodes.
  2. Log in to the primary MDM using SSH.
  3. Validate if the cluster status is normal by running the following command:
    scli --query_cluster
    
         
  4. Log in to all nodes running PowerFlex management platform processes.
  5. From each PowerFlex management platform node, use the lsblk command to check the status of the exported volumes, and stop when the partitions are displayed under the scinia device.
    If partitions are not visible, but the cluster reports as healthy, use the partprobe command to rescan the attached block devices.
  6. Run the following command to check the status of the rke2-server process on all the PowerFlex management platform nodes:
    systemctl status rke2-server
    If the status is active, go to the next step. If the status is shown as activating, repeat the status check until active. If status is failed, attempt to start the service by running:
    
          
    systemctl start rke2-server
    
         
  7. Once rke2-server is running, ensure the PowerFlex management platform nodes are in a ready state by running:
    kubectl get nodes
    
          If a message is displayed, wait for a few minutes and verify again. After nodes are indicated as ready, continue to the next step.
         
  8. Restore the PowerFlex Manager database.
    1. To gather the IP address of the database service, run:
      export NAMESPACE=powerflex
      export DBSA_IP=$(kubectl get service/postgres-monitor-leader -n $NAMESPACE -o jsonpath='{.spec.clusterIP}')
      
             
    2. To start the database pods and service, run:
      curl -i -H "Accept: application/json" "http://$DBSA_IP:8080/pgclusterstartup"
      
      
             
    3. To check the start up status, run:
      curl -i -H "Accept: application/json" "http://$DBSA_IP:8080/pgclusterstartupstatus"
      
             
    4. Continue to run the startup status command until the status returns a verified status.
      Here is an example output of a verified status:
      HTTP/1.1 200 OK
      Date: Mon, 05 Aug 2024 18:36:14 GMT
      Content-Length: 47
      Content-Type: text/plain; charset=utf-8
      {"return_status":0,"startup_status":"verified"}
      
             
  9. Log in to PowerFlex Manager:
    1. Go to Monitoring > Management Diagnostics > Diagnostics.
      The diagnostic page opens which displays PowerFlex management platform diagnostic cards. In the result icon, last run date, run time, and run state are listed for each diagnostic card.
    2. To manually start a diagnostic, click Run Now.
      A notification message confirms that the specified diagnostic has started. After a diagnostic run begins, you can cancel it. If there are errors, a failure message displays. The overview displays the run state, start time, and end time. If errors occur, the diagnostic result displays failure reasons, recommendations to remediate failures, and raw output.
    3. Click View Raw Output for more information.

 

Berørte produkter

PowerFlex rack, VxFlex Ready Nodes, PowerFlex Appliance, PowerFlex custom node, ScaleIO, PowerFlex appliance connectivity, PowerFlex appliance HW, PowerFlex appliance Intelligent Catalog Software, PowerFlex appliance R650, PowerFlex appliance R6525 , PowerFlex appliance R660, PowerFlex appliance R6625, Powerflex appliance R750, PowerFlex appliance R760, PowerFlex appliance R7625, PowerFlex appliance R860, PowerFlex custom node, PowerFlex custom node HW, PowerFlex custom node R650, PowerFlex custom node R6525, PowerFlex custom node R660, PowerFlex custom node R6625, PowerFlex custom node R750, PowerFlex custom node R760, PowerFlex custom node R7625, PowerFlex custom node R860, PowerFlex rack connectivity, PowerFlex rack HW, PowerFlex rack RCM Software, PowerFlex Software, VxFlex Ready Node, VxFlex Ready Node R640, VxFlex Ready Node R740xd, PowerFlex appliance R640, PowerFlex appliance R740XD, PowerFlex appliance R7525, PowerFlex appliance R840, VxFlex Ready Node R840, VxRack Flex-PowerEdge 14G ...
Artikelegenskaber
Artikelnummer: 000537669
Artikeltype: How To
Senest ændret: 24 nov. 2026
Version:  2
Find svar på dine spørgsmål fra andre Dell-brugere
Supportservices
Kontrollér, om din enhed er dækket af supportservices.