Data Domain - After HA failover, veth alias interface fails to come up on alternate node

摘要: DD HA node rebooted after panic or issue; failover occurred but interconnect and veth alias interface did not come up on alternate node.

本文适用于 本文不适用于 本文并非针对某种特定的产品。 本文并非包含所有产品版本。

症状

The logs will show that there are two issues when node1 becomes active after HA failover.

1. Vethx:x on node1 was not assigned an IP address after failover. Ha.log shows the message "can't set the netmask 255.255.x.x for vethx:x, error (99) Cannot assign requested address" but it ended with "Interface, veth, configuration complete, err = 0". This seems to be a conflicting message in DD plib.

2. Vethx:x on node1 was up but not running after HA failover. Kern.log shows bonding interfaces ethXx, and ethXx were both up.


原因

The issue occurs when assigning a netmask to an interface fails because the interface does not yet have an associated IP address.

If no address is associated with the interface, assigning one during startup takes time, and this delay is longer if no previous address existed.

If during this "finite time" the netmask is set in the kernel fails to match the netmask to the address, and will return an error. Receiving an error the SMS code puts down the interface, removing the address.
 

A fix was added for this issue:

If a 99 error is returned, it waits a second and tries to read the address. If it reads the address, the netmask is set again.
If it does not read the address or it gets another error trying to set the netmask, then it returns that error.

In the system, there is no new error logged after netmask error. The log also indicates that the configuration is complete.

05/03 06:04:24 NOTICE: dd_plib_net_setup(): Interface, vethx:x, configuration complete, err = 0. 
 

Ideally, this would mean that the program could configure netmask successfully after reading the IP address, but the IP address was still not configured on vethx:x.

Issue reproduced in lab by engineering existing code path does not reassign IP address to floating interfaces (after HA failover) when there is a netmask error. 

解决方案

To temporarily, restore connectivity to the vethx.x alias interface disable and enable the interface. 

Issue is Fixed DDOS Version/s: DDOS-7.10.0.0, DDOS-7.11.0.0, DDOS-7.7.5.0 

受影响的产品

Data Domain
文章属性
文章编号: 000205462
文章类型: Solution
上次修改时间: 13 1月 2026
版本:  4