Unsolved
This post is more than 5 years old
4 Posts
0
358
Preparing E20-324 load of 70% both SP
Hi,
What happend when in a VNX array that we are using to backup-to-disk instead of for tape backupes with 125 disks the consistent utilization of over 70% of both SPs?
I think that the array should not permit additional load, but I am not sure.
Thank you.