The following
table describes the prerequisites for the FCoE solution offered using
Rack Server, S5000, and Compellent. For more information, see http://en.community.dell.com/techcenter/extras/m/white_papers/20387203
Resource |
Prerequisites |
S5000 |
-
DCB needs to be enabled.
-
VLT needs to be disabled.
-
Enable Fibre Channel capability and Full Fabric mode.
feature fc
fc switch-mode fabric-services
-
Enable FC ports connecting to Compellent storage array and
FC ports connecting to other S5000 switch via ISL links.
interface range fi 0/0 - 7
no shut
-
Create DCB Map.
dcb-map SAN_DCB_MAP
priority-group 0 bandwidth 60 pfc off
priority-group 1 bandwidth 40 pfc on
priority-pgid 0 0 0 1 0 0 0 0
exit
-
Create a FCoE VLAN.
interface vlan <VLAN ID> [Create VLAN for FCoE]
exit
-
Create FCoE Map.
fcoe-map default_full_fabric
fabric-id <FCoE VLAN ID> vlan <FCoE VLAN Id>
fc-map <FC MAP>
exit
|
Compellent |
Fault domain need to be created as per Compellent best practices.
|