Unsolved
This post is more than 5 years old
2 Intern
•
30 Posts
0
479
July 30th, 2013 11:00
How to run or schedule a Custom Control Panel ?
Has anyone had success running or scheduling a custom control panel in version 6?
I have 2 reports that run in the Run Reports area, and have them built into a custom control panel, but there doesn;t seem to be any "RUN NOW" button, nor anywhere where I can configure a schedule to get the control panel to run. I've tried creating a navigation menu, and adding the control panel to it, but still, there's nowhere to run it or to schedule it to run.
Any tips wouold be helpful.
Thanks,
Marty
No Events found!

