UNSOLVED

s_vaynshenk

updated

10 years ago

S

s_vaynshenk

1 Message

0

2364

February 3rd, 2017 14:00

running one job on two drives

Hello

I have a tape library partitioned into two logical halves. One half (with two drives) is connected to our Networker 9.0.0.2.Build.448. I have multiplexing active and max parallelism is set to parameters. Now, I know that if i have two jobs in different pools then then both the drives should be used. I also know that I can run two job in the same pool onto one drive. I'm wondering how I can force ONE job to run on both the drives. I've tried force mounting a tape and there was no result. I've adjusted target sessions (4 with 32 max), max parallelism(2) and server parallelism (256) with no visible effect. Am I missing something or is it simply not possible?