UNSOLVED
Splitting Vplex Dual Engines and power requirements
Hi
1. We are deploying a vplex dual engine and customer has requested to split the dual engine to both racks. Both racks are within the same datacenter. Both engine will still be connected via FC for the frontend and backend connectivities as per best-practice between racks. Will this post a concern?
2. Vplex documents in the EMC support website don't specify the power requirements of individual components of the vplex system, KVA and Amp of the management server, Engine 1, Engine 2, SPS, FC-com Switch and so on.
Please advise on the above. Thanks.
regards
chan
Responses (0)