Zu den Hauptinhalten
  • Bestellungen schnell und einfach aufgeben
  • Bestellungen anzeigen und den Versandstatus verfolgen
  • Profitieren Sie von exklusiven Prämien und Rabatten für Mitglieder
  • Erstellen Sie eine Liste Ihrer Produkte, auf die Sie jederzeit zugreifen können.
  • Verwalten Sie mit der Unternehmensverwaltung Ihre Dell EMC Seiten, Produkte und produktspezifischen Kontakte.

Dell PowerEdge FN I/O Module Configuration Guide 9.10(0.0)

PDF

Troubleshooting PFC, ETS, and DCBx Operation

In the show interfaces pfc | ets | dcbx output, the DCBx operational status may be down for any of the reasons described in the following table.

When DCBx is down, the following values display in the show output field for DCBx Oper status:
  • PFC DCBx Oper status: Down
  • ETS DCBx Oper status: Down
  • DCBx Oper status: Disabled.
Reason Description
Port Shutdown Port is shut down. All other reasons for DCBx inoperation, if any, are ignored.
LLDP Rx/Tx is disabled LLDP is disabled (Admin Mode set to rx or tx only) globally or on the interface.
Waiting for Peer Waiting for peer or detected peer connection has aged out.
Multiple Peer Detected Multiple peer connections detected on the interface.
Version Conflict DCBx version on peer version is different than the local or globally configured DCBx version.
Config-source Down Although DCBx parameters match in auto-upstream or auto-downstream port, the configuration source (elected dynamically or CLI-configured) is down.
Unrecognized TLV received Invalid TLV length TLV has been received. In the case of an invalid PFC or ETS TLV, the error displays in the show interfaces pfc | ets output. The show interfaces dcbx output displays PFC or ETS as down.
Admin Mode OFF (Local) Local Admin Mode is disabled.
Admin Mode OFF (Remote) Remote Admin Mode is disabled.
Waiting for ACK from Peer For a legacy DCBx version, a peer has not acknowledged the reception of a sent packet. This reason displays only when a remote peer is willing to receive a DCB configuration.
Error Bit set For a legacy DCBx version, a peer has sent packets with an error bit set. This reason displays only when a remote peer is willing to receive a DCB configuration.
Enabled with ETS Mismatch ( show interfaces dcbx output) DCBx is enabled but an ETS validation failure error has occurred.
PFC is down ( show interfaces pfc output) One of the following PFC-specific errors has occurred:
  • No MBC support.
  • Configured PFC priorities exceed maximum PFC capability limit.
  • New dot1p-to-queue mapping violates the allowed system limit for PFC Enable status per priority
ETS is down ( show interfaces ets output) One of the following ETS-specific errors occurred in ETS validation:
  • Unsupported PGID
  • A priority group exceeds the maximum number of supported priorities.
  • COSQ is mapped to more than one priority group.
  • COSQ is mapped to more than one priority group. - Invalid or unsupported transmission selection algorithm (TSA).
  • Bandwidth is configured for an unconfigured priority group.
  • Total ETS bandwidth mapped in priority groups is not equal to 100%.
  • Priorities mapped to a queue use different TSAs.
  • Total bandwidth assigned to priorities in one or more priority groups is not equal to 100%.
Or one of the following ETS failure errors occurred:
  • Incompatible priority group ID (PGID).
  • Incompatible bandwidth (BW) allocation.
  • Incompatible TSA.
  • Incompatible TC BW.
  • Incompatible TC TSA.

Diesen Inhalt bewerten

Präzise
Nützlich
Leicht verständlich
War dieser Artikel hilfreich?
0/3000 characters
  Bitte geben Sie eine Bewertung ab (1 bis 5 Sterne).
  Bitte geben Sie eine Bewertung ab (1 bis 5 Sterne).
  Bitte geben Sie eine Bewertung ab (1 bis 5 Sterne).
  Bitte geben Sie an, ob der Artikel hilfreich war.
  Die folgenden Sonderzeichen dürfen in Kommentaren nicht verwendet werden: <>()\